Design Standards - 11,000 Volt

CA2A/2
Jointing Configurations for 11kV Cables
08/06/2016 12:04:30
CA2C/9
General Requirements for 11kV Cable Jointing
08/06/2016 12:08:40
CA2M/4
Procedures for Making 11kV Cable Branch Joints
08/06/2016 12:11:48
CA2N/6
Procedures for Making 11kV Cable Stop Ends
08/06/2016 12:12:58
CA2O/4
Procedures for Making 11kV Cable Loop Joints
08/06/2016 12:16:57
CA2S/3
E 5 Numbers for 11kV Cable Jointing Materials
08/06/2016 16:15:38
CA2T/4
Tools Required for 11kV Cable Jointing
08/06/2016 12:07:12
CA2U/4
Procedures for Making 11kV Cable EPR Terminations
08/06/2016 12:14:18
CA2V/4
Procedures for Making 11kV Cable Straight Joints
08/06/2016 12:10:13
CA2W
Procedure for Making an 11kV Trefoil Bond Joint
08/06/2016 12:18:20
EE132
Earthing Materials and Associated Sundry Items
28/08/2015 14:40:12
EE136
Ancillary Electrical Equipment for Use in Conjunction with Switchgear and Protection/Control Panels
03/07/2017 16:17:27
EE185
12kV Indoor Circuit Breakers
03/07/2017 15:12:08
EE82/1
Specification for Single Core Wet Design of 11kV Medium Voltage EPR Insulated Cables
18/03/2015 08:43:29
NC2D/2
Specification of Connection Assets
05/03/2014 08:38:58
SD1C
Selection and Application of WPD Assessed Switchgear for Use on the Distribution Network
17/09/2015 14:02:21
SD1E/3
Technical Requirements for Customer Export Limiting Schemes
03/03/2017 12:25:24
SD1F/2
Competition in Connections Code of Practice (COP) - Procedure for network analysis by Independent Connection Providers (ICPs)
03/06/2016 14:50:25
SD1F/2 - Audit Form
SD1F/2 - Point of Connection & Contestable Design Audit Form (hyperlinked to SD1F/2 - page 10)
03/06/2016 15:00:33
SD1G/1
Communications Requirements for Parallel Generation Sites
22/04/2016 14:28:11
SD1H/1
The Treatment of Losses in an Inclusive Network Design Process
17/05/2017 11:54:33
SD4/7
11kV and 6.6kV System Design
15/07/2015 11:11:11
SD4A/1
Design of Western Power Distribution's 11kV and 6.6kV Networks
06/07/2016 14:52:35
SD4D
The use of Simplified Load Flow Techniques for 11kV Network Design
30/10/2017 12:35:50
SD4O/1
Standard HV Connection Arrangements
14/10/2015 16:54:24
SD4T
Provision of HV Network Data to ICPs for Connection Design
30/09/2015 16:46:55
SD6F/1
Dealing with Potentially Disturbing Electrical Loads/Equipment
19/01/2018 11:42:31
SD7F/2
Determination of Short Circuit Duty for Switchgear on the WPD Distribution System
02/08/2017 10:42:25
TP18A
Application of Generator Constraint Panels
27/01/2016 08:50:08
TP21A/2
Safety Limits for Touch and Step Voltages - Earthing System Design/Assessment
02/05/2014 17:37:53
TP21B/1
Design and Installation of Fixed Earthing Systems - Major Substations
07/04/2016 11:36:58
TP21D/2
11kV, 6.6kV and LV Earthing
21/10/2015 14:32:58
TP21K/1
Substation Compound Fence Earthing
08/07/2014 16:15:41
TP4B/2
11kV and 6.6kV Transformer Protection
23/01/2014 08:39:33
TP50H
Loss of Mains Protection in the South West Area
19/04/2017 09:40:55
WPD G81 Part 1
Housing Development Design framework
12/12/2012 18:14:19
WPD G81 Part 4
Framework for Design and Planning of Industrial and Commercial Underground Connected Loads up to and including 11kV
28/04/2016 16:55:41