Design Standards - 132,000 Volt

EE132
Earthing Materials and Associated Sundry Items
28/08/2015 14:43:45
EE89/2
Fixed Earthing Systems for Major Substations
08/01/2013 11:27:35
NC2D/2
Specification of Connection Assets
05/03/2014 08:43:14
SD1C
Selection and Application of WPD Assessed Switchgear for Use on the Distribution Network
17/09/2015 14:06:08
SD1E/3
Technical Requirements for Customer Export Limiting Schemes
03/03/2017 12:27:30
SD1F/2
Competition in Connections Code of Practice (COP) - Procedure for network analysis by Independent Connection Providers (ICPs)
03/06/2016 14:53:36
SD1F/2 - Audit Form
SD1F/2 - Point of Connection & Contestable Design Audit Form (hyperlinked to SD1F/2 - page 10)
03/06/2016 15:03:01
SD1G/1
Communications Requirements for Parallel Generation Sites
22/04/2016 14:32:16
SD1H/1
The Treatment of Losses in an Inclusive Network Design Process
17/05/2017 11:56:37
SD2/6
132kV System Design
06/01/2015 08:55:07
SD7F/2
Determination of Short Circuit Duty for Switchgear on the WPD Distribution System
02/08/2017 10:44:39
TP21A/2
Safety Limits for Touch and Step Voltages - Earthing System Design/Assessment
02/05/2014 17:42:22
TP21B/1
Design and Installation of Fixed Earthing Systems - Major Substations
07/04/2016 11:39:26
TP21K/1
Substation Compound Fence Earthing
08/07/2014 16:20:08
TP21S/1
Application of Surge Arresters to Grid Transformers
12/09/2017 11:00:11
TP21S/1 - Spreadsheet
TP21S/1 - Calculation Spreadsheet (hyperlinked to TP21S/1 - pages 3 & 6)
12/09/2017 11:16:18
TP50H
Loss of Mains Protection in the South West Area
19/04/2017 09:43:03