Design Standards - 33,000 Volt

CA3A
Jointing Configurations for 33kV Cables
19/04/2017 08:51:18
CA3C/2
General Requirements for 33kV Cable Jointing
19/04/2017 08:54:14
CA3L/2
Procedures for Making 33kV Single Core Cable EPR Branch Joints
05/11/2014 08:52:35
CA3M/3
Procedures for Making 33kV Cable Straight Joints
05/11/2014 08:55:31
CA3N/2
Procedures for Making 33kV Single Core Cable Stop End Joints
05/11/2014 08:57:23
CA3P/2
Procedures for Making a 33kV Trefoil Bond Joint
05/11/2014 09:02:27
CA3V/3
Procedures for Making 33kV Cable Terminations
05/11/2014 09:07:02
CA3X
E 5 Numbers for 33kV Cable Jointing Materials
19/04/2017 08:52:34
CA3Y
Tools Required for 33kV Cable Jointing
19/04/2017 08:53:28
EE132
Earthing Materials and Associated Sundry Items
28/08/2015 14:41:22
EE136
Ancillary Electrical Equipment for Use in Conjunction with Switchgear and Protection/Control Panels
03/07/2017 16:20:34
EE182
36kV Indoor Primary Circuit Breakers
03/07/2017 15:14:04
EE89/2
Fixed Earthing Systems for Major Substations
08/01/2013 11:22:59
NC2D/2
Specification of Connection Assets
05/03/2014 08:40:29
SD1C
Selection and Application of WPD Assessed Switchgear for Use on the Distribution Network
17/09/2015 14:03:58
SD1E/3
Technical Requirements for Customer Export Limiting Schemes
03/03/2017 12:26:12
SD1F/2
Competition in Connections Code of Practice (COP) - Procedure for network analysis by Independent Connection Providers (ICPs)
03/06/2016 14:51:35
SD1F/2 - Audit Form
SD1F/2 - Point of Connection & Contestable Design Audit Form (hyperlinked to SD1F/2 - page 10)
03/06/2016 15:01:25
SD1G/1
Communications Requirements for Parallel Generation Sites
22/04/2016 14:29:15
SD1H/1
The Treatment of Losses in an Inclusive Network Design Process
17/05/2017 11:55:17
SD3/7
66kV and 33kV System Design
05/11/2014 09:11:30
SD3A/2
Low Voltage AC Supplies at 33kV and 66kV Substations
04/12/2015 14:57:07
SD6F/1
Dealing with Potentially Disturbing Electrical Loads/Equipment
19/01/2018 11:43:08
SD7F/2
Determination of Short Circuit Duty for Switchgear on the WPD Distribution System
02/08/2017 10:43:19
TP18A
Application of Generator Constraint Panels
01/02/2016 08:39:32
TP21A/2
Safety Limits for Touch and Step Voltages - Earthing System Design/Assessment
02/05/2014 17:39:49
TP21B/1
Design and Installation of Fixed Earthing Systems - Major Substations
07/04/2016 11:37:54
TP21K/1
Substation Compound Fence Earthing
08/07/2014 16:17:21
TP21S/1
Application of Surge Arresters to Grid Transformers
12/09/2017 10:58:37
TP21S/1 - Spreadsheet
TP21S/1 - Calculation Spreadsheet (hyperlinked to TP21S/1 - pages 3 & 6)
12/09/2017 11:14:29
TP50H
Loss of Mains Protection in the South West Area
19/04/2017 09:41:43