Design Standards - 66,000 Volt

EE132
Earthing Materials and Associated Sundry Items
28/08/2015 14:42:33
EE89/2
Fixed Earthing Systems for Major Substations
08/01/2013 11:25:00
NC2D/2
Specification of Connection Assets
05/03/2014 08:41:55
SD1C
Selection and Application of WPD Assessed Switchgear for Use on the Distribution Network
17/09/2015 14:04:57
SD1E/3
Technical Requirements for Customer Export Limiting Schemes
03/03/2017 12:26:55
SD1F/2
Competition in Connections Code of Practice (COP) - Procedure for network analysis by Independent Connection Providers (ICPs)
03/06/2016 14:52:32
SD1F/2 - Audit Form
SD1F/2 - Point of Connection & Contestable Design Audit Form (hyperlinked to SD1F/2 - page 10)
03/06/2016 15:02:15
SD1G/1
Communications Requirements for Parallel Generation Sites
22/04/2016 14:31:28
SD1H/1
The Treatment of Losses in an Inclusive Network Design Process
17/05/2017 11:56:00
SD3/7
66kV and 33kV System Design
05/11/2014 09:13:12
SD3A/2
Low Voltage AC Supplies at 33kV and 66kV Substations
04/12/2015 14:58:10
SD7F/2
Determination of Short Circuit Duty for Switchgear on the WPD Distribution System
02/08/2017 10:44:02
TP21A/2
Safety Limits for Touch and Step Voltages - Earthing System Design/Assessment
02/05/2014 17:41:13
TP21B/1
Design and Installation of Fixed Earthing Systems - Major Substations
07/04/2016 11:38:41
TP21K/1
Substation Compound Fence Earthing
08/07/2014 16:18:47
TP21S/1
Application of Surge Arresters to Grid Transformers
12/09/2017 10:59:27
TP21S/1 - Spreadsheet
TP21S/1 - Calculation Spreadsheet (hyperlinked to TP21S/1 - pages 3 & 6)
12/09/2017 11:15:10
TP50H
Loss of Mains Protection in the South West Area
19/04/2017 09:42:23