Design Standards - Low Voltage

 
CA1AB 1
Procedures for Making Low Voltage Mains Three Core Wavecon Connection/Disconnection Joints
12/12/2012 17:41:08
CA1C/7
General Requirements Low Voltage Mains Jointing
03/02/2017 18:04:51
CA1D/4
Procedures for Making Low Voltage Mains Cable Straight Joints
21/12/2012 12:16:56
CA1E/4
Procedures for Making Low Voltage Mains Cable Branch Joints
09/07/2013 17:02:43
CA1F 3
Procedures for Making Low Voltage Mains Cable Stop Ends
12/12/2012 17:43:14
CA1G/6
Procedures for Making Low Voltage Mains Cable Terminations
08/07/2014 16:27:08
CA1H/6
Procedures for Making Low Voltage Mains Cable Disconnecting Boxes
27/08/2014 08:49:16
CA1I 4
Procedures for Making Low Voltage Mains Cable Service Branch Joints
12/12/2012 17:47:36
CA1U 2
Jointing of Paper Insulated Concentric and Triple Concentric Mains Cable
12/12/2012 17:48:38
CA1Y 1
Procedures for Making Low Voltage Mains Cable Loop Joints
12/12/2012 17:49:12
EE132
Earthing Materials and Associated Sundry Items
28/08/2015 14:38:49
MI14D
Earth Loop Impedance Testing of Services
13/12/2012 10:02:10
NC2D/2
Specification of Connection Assets
05/03/2014 08:37:18
SD1E/3
Technical Requirements for Customer Export Limiting Schemes
03/03/2017 12:24:07
SD1F/2
Competition in Connections Code of Practice (COP) - Procedure for network analysis by Independent Connection Providers (ICPs)
03/06/2016 14:49:00
SD1F/2 - Audit Form
SD1F/2 - Point of Connection & Contestable Design Audit Form (hyperlinked to SD1F/2 - page 10)
03/06/2016 14:59:43
SD1H/1
The Treatment of Losses in an Inclusive Network Design Process
17/05/2017 11:53:28
SD5/4
LV System Design
25/02/2015 14:27:15
SD5A/3
Design of Low Voltage Domestic Connections
29/10/2015 11:05:54
SD5B
Low Voltage Connections with Minimal Network Analysis
17/09/2015 14:12:26
SD5C/2
Low Voltage Connections to Multiple Occupancy Buildings
11/05/2016 15:39:44
SD5D/2
Arrangements for LV Cut-Outs
27/06/2013 10:32:01
SD5E/1
Design of Low Voltage Commercial and Industrial Connections
14/08/2017 14:27:38
SD5E/1 - Spreadsheet
SD5E/1 - Calculation Spreadsheet (hyperlinked to SD5E/1 - pages 13, 15 & 35)
21/04/2017 14:44:01
SD5F
Connecting Multiple Small Low Voltage Connections with Limited Network Analysis
30/10/2017 12:40:57
SD5K/5
Use of WinDebut Software
17/09/2015 14:14:05
SD5R/1
Earth Fault Loop Impedances and Phase to Neutral Loop Impedances at LV Installations
13/12/2012 10:03:56
SD6F/1
Dealing with Potentially Disturbing Electrical Loads/Equipment
19/01/2018 11:41:38
SD6J
Connection design - potentially disturbing electrical equipment rated less than or equal to 75A / phase subject to conditional connection
08/04/2016 09:15:22
SD7A/6
Data Sets Used with Windebut Software
24/02/2016 11:36:34
TP21D/2
11kV, 6.6kV and LV Earthing
21/10/2015 14:32:00
TP21E/1
Provision of WPD Earth Terminals to Customer LV Installations
27/08/2014 09:16:31
TP50H
Loss of Mains Protection in the South West Area
19/04/2017 09:39:40
WPD G81 Part 1
Housing Development Design framework
12/12/2012 17:55:27
WPD G81 Part 3-2
Housing Development Installation and Records framework
12/12/2012 17:49:58